Dewatering Hotel Site, Parksville BC

This ocean front hotel site required a perimeter wellpoint system to control ground water during the piling and deep center concrete footing installation. Dewatering was also necessary to complete the installation of the structural floating concrete slab. Heavy rains and fluctuating tides kept Excel Dewatering crews very busy monitoring this project to overcome "mother nature " and keep the site free of ground water.