DEWATERING PROJECTS

 

Dewatering of One Water Street, Kelowna BC

Excel Dewatering was chosen to provide ground water control for this Iconic project in downtown Kelowna, British Columbia.
 

dewatering-one-water-street-twin-towers-in-BC

Dewatering of Wetlands for New Subdivision, Edmonton AB

This new subdivision in wet lands required wellpoint dewatering for the installation of sanitary and storm sewer infrastructure
 

Dewatering-wetlands-for-new-subdivision

Wellpoint Dewatering For Downtown Kelowna Revitalization

A key part to the success of the $14 mil Kelowna Downtown Revitalization and Downtown Marina projects was to wellpoint dewater the deep utilities and underground storage tank.
 

dewatering deep utilities

Dewatering Vernon Waste Water Treatment Plant

The entire site of the new Vernon Waste Water Treatment Plant required wellpoint dewatering. Two wellpoint pumps were used to control ground water levels as the soils were structurally placed and all deep concrete footings, slabs and walls were poured.
 

waste water treatment plant dewatering

Wellpoint Dewatering System, Invermeer BC

With todays standards of installing underground utilities contractors can't afford to battle ground water. Excel Dewatering installed this wellpoint system into highly permiable gravels and pumped nearly 4000 GPM to achieve a dry ditch for the crews.
 

dry ditch after dewatering

Dewatering Hotel Site, Parksville BC

This ocean front hotel site required a perimeter wellpoint system to control ground water during the piling and deep center concrete footing installation. Dewatering was also necessary to complete the installation of the structural floating concrete slab. Heavy rains and fluctuating tides kept Excel Dewatering crews very busy monitoring this project to overcome "mother nature " and keep the site free of ground water.
 

dewatering beside ocean

Dewatering Earth Dam For Rehabilitation, Revelstoke BC

To repair this earth dam the reservoir had to be pumped down to the lowest point and then the wellpoint system was installed to dewater the sands below. After excavation was achieved impermeable material was hauled in to re-seal the affected area.
 

wellpoint dewatering around earth dam

River Diversion and Potable Water Intake Structure, Ashcroft BC

Aqua Dam was utilized to divert the Thompson River for the installation of a new fresh water intake gallery and wet well structure. Excel Dewatering monitored the pumping equipment 24/7 at this project ensuring a dry work area.
 

pumping system on thompson river

Highway Expansion Project, Kelowna BC

A portion of this $7 mil highway expansion project in Kelowna req'd dewatering. This wellpoint system lowered the water table over 8 feet for the soils work to be completed in the dry.
 

pumping system on thompson river